Future Planned Projects

Lake bank repair (102nd place north between 38th st. and 39th st.) 
   - repair date to be determined, 
   - Budget cost reevaluated - (need review for 2023)
   - Budget reserve maturity Jan 2025

Playground repair/replace/refresh
   - repair / replacement date TBD
   - Budget cost reevaluated - (need review for 2023)
   - Budget reserve maturity Jan 2028 

Gazebo
   - repair /replacement date TBD
   - Replacement cost reevaluated - 2021
   - Budget reserve maturity Jan 2030

Tennis Court Fence
   - repair / replacement date TBD
   - Replacement cost reevaluated - 2021
   - Budget reserve maturity Jan 2031

Tennis Court Surface
   - repair / replacement date TBD
   - Budget cost reevaluated - 2016 (need review for 2023)
   - Budget reserve maturity Jan 2032

Asphalt walks in park
   - repair / replacement date TBD
   - Budget cost reevaluated - 2016 (need review for 2023)
   - Budget reserve maturity Jan 2037

Street Paving by City of Pinellas Park
(Dates provided by City of Pinellas Park, HOA makes no promise)
Phase 3: Sidewalk improvements and Roadway resurfacing
             39th Street east to 36th Street projected completion in (2023)
Phase 4: Sidewalk improvements and Roadway resurfacing
             42rd Street to 39th Street. projected completion in (2024)

Ongoing Projects

Rules and Regulations

covenants conditions and restrictions addendums

Repair aging parts on Playground (seeking vendor and part to repair)

Replace tennis court nets. (Currently repaired)

City Paving Lake Blvd from 43rd to the East (the dead end) 
 Streets from 39th Street east to 36th Street 

Completed Projects

Replace defective timer on tennis court lights.
   - done 2/2022

Pressure washing sidewalk along HOA property
  - lake access area on 103rd Ave east of 38th. 
  - done 3/2022

Tree Trim in commons on 103rd lake 
    - done 2/2022

Replaced Gates on Tennis Court
  - done 2020

Park planting and mulching
   - Last done Spring of 2021

Waterside monument sign on Lake blvd and 39th st  
  - repainted 2021

Electrical conduit repair on Gazebo
- replaced receptacle cover Dec 2021

Replace weatherproof receptacle cover at power demarcation area
- replaced receptacle cover Dec 2021

Street Paving by City of Pinellas Park
- Phase 1: Paving Lake Blvd from 49th Street to 43rd Street - Completed 2021
Phase 2: Paving Lake Blvd from 43rd to the East (the dead end) 
              including several cul-de-sacs projected completion in (2022)
Phase 2a: Bike lanes and roadway marking improvements for Lake Blvd projected completion in (2022)

Replace bicycle lock on tennis court gate with a tethered combination master lock.
- replaced with combination locks Jan 2022